Project: Exploration campaign Ref Galp Energy Namibia
Client: Exceed
Location: Namibia
Client Contact: Cameron Reid, Supply Chain Manager and Stuart Duncan, Logistics Manager
Date: 2023
Duration: 3 months
Specific Products Provided: OCTG and accessories
Exceed required the supply of OCTG and accessories to Namibia, with equipment delivered via two international shipments in August 2023, one originating from Houston and a consolidated shipment from Antwerp.
Alongside the supply of the required equipment, Apex Tubulars supported pre-shipment planning, logistics coordination and delivery through to the Namibia supply base, ensuring the OCTG and accessories were available in line with the planned operational schedule.
Coordinating the supply and delivery presented a number of logistical and operational challenges, including:
Two international shipments departing from separate locations, requiring careful coordination to maintain the planned delivery schedule.
Safe handling of the tubulars throughout shipment, vessel discharge and onward transportation to the supply base.
With the operational programme dependent on the equipment being available when required, effective coordination was essential to avoid unnecessary delays at the vessel and supply base.
Through early planning, clear communication and close coordination with the operations team, Apex Tubulars successfully managed the preparation and delivery of both the Houston and consolidated Antwerp shipments.
By working closely with those involved throughout the operation, we helped ensure the required OCTG and accessories reached the Namibia supply base safely and in line with the planned schedule.
This approach enabled Exceed to:
Complete the overall operation on time, with both international shipments executed smoothly and efficiently.
Maintain clear communication throughout the project, keeping the operations team informed from initial planning through to delivery.
Ensure the required OCTG and accessories were available in Namibia when needed, supporting the planned operational programme.
Identify valuable learning around the presentation of pre-slung casing, helping to further
By combining strong pre-job planning with responsive communication and coordinated logistics, Apex Tubulars helped Exceed complete both shipments on time while identifying practical improvements for future operations.
"The operation was well coordinated and on time. The initial communication and planning with the Apex team were second to none, and execution was smooth and well-coordinated."
Cameron Reid
Supply Chain Manager